The plan

its 2016. happy new year.
a long time has passed since a post, or even significant work has occurred..
in the mean time, tinkering has happened, had a first go a tuning out the engine (carb balancing etc.), fitting in the new indicators (bike side) and just all round tinkering

the plan this year, is to get the bike to a road ready state by the spring. Yes the 'spring' is still an undefined time. but that's the plan.
as for what need to be done:
  • new chromed 8.8 steel bolts on everything ***
  • replace telescopic bottoms (chromed new)   ***
  • replace telescopic screw in tops (new - keep old seals)  ***
  • replace front axle (new chromed)  *** - not possible, seems new one is different in design
  • add front wheel 'bearing cap' to keep out the crap  ***
  • replace rear swing arm caps with nice new chromed ones  ***
  • new generator
  • replace rubber air inlets with new ones 33mm straight  ***
  • replace both l/r valves +grind in   ***  (half done)
  • rubber covers on exposed connectors (where possible)  ***
  • look at tidying up rear seat handle as its not as tidy as i want
  • balance carbs better
  • re-rivet / clean sidecar cover - douse inside with a better waterproofing. ***
  • front brake switch ***
  • rear brake switch ***
  • indicators for side car ***
  • properly wiring up all the indicators to the wiring loom 
  • blast cylinder heads  - powder coat  skipped as i cleaned/painted them up myself
  • re-coat rear suspension adjusters in cellulose metal lacquer
  • paint lower end of speedo cable (in situe) - it seems to be missing it protective layer.. #
  • repaint handle bars as there is a chip #
  • repaint tank as there is a chip #
  • repaint rear mudguard  as there is a chip#
  • repaint pillion passenger seat mount (as there is a chip)
  • repaint side car (as there is a chip here too - yes a few bits have chips, i had a case of ill placed,  falling tools one day....)#
  • repaint air inlet - bit of a gas leak splashed on a section, removing the finish... # 
  • repaint exhaust down pipes - not happy with the finish of the particular brand of V HT paint & bit of a gas leak removed the finish... #
items with *** indicate i already have purchased or own the required components, anything else is pending...

although a non definitive list, its the bulk of what needs to be done. As an adjustable time limit, id say all this will be completed by mid February - taking into account shipment time for parts from Russian federation/Ukraine.